Amish Classic Gable Style Wood Cottage DIY Shed Kit



Dimensions & Specifications
LP Smartside siding and trim
Kits will be primed and ready for paint
6" Gable Overhang
4' Double door on 8' wide buildings
5' Double door on 10' and 12' buildings
Steel single door with half glass
Locking latch on front
2 windows and vinyl shutters standard on 8x12 and larger
16" on center 2"x4" framing for walls
5'10" high front and back wall
24" on center 2x4 trusses
5/8" plywood floor
16" on center 2x4 floor joists upright on floor
8' wide buildings have 2 treated 4x4s
10' and 12' wide buildings have 5 pressure treated 4x4s
7/16 OSB sheeting
Aluminum Gable vents
Everything is precut and ready to assemble
Standard Feature:
Precut DIY Kit with Optional Floor Kit
Additional Options:
Size
Floor Kit
Flower Box (wood)
Optional Floor Kit
5/8” Plywood Flooring
2x4 Floor Joists
4x4 Treated Runners
Customer Provides:
Shingles
Drip Edge
Paint
Above items can easily be purchased at your local hardware store!
Shipping:
Larger units may ship on two pallets
Ships via freight carrier and may require an appointment for delivery
Liftgate delivery with a patent-pending delivery method for improved convenience.
Delivery Cost & Lead Time
Additional Information
All preparatory work of the site is the responsibility of the property owner. Whatever surface you choose to place your structure on, that surface should extend out approximately 1’ wider on all sides of your structure. Most importantly, be sure you have a level surface for your building.
Again, the most important thing is that the site is level. We recommend a crushed stone, patio block, or concrete pad to form a base, however the base of our cottage kits are constructed of treated lumber and may be placed directly on the ground. When preparing a base you should make the base at least 1' wider on all sides of the playhouse.
There are several ways to prepare your site including the following:
Crushed Stone - We recommend using crushed stone (3/4" clean) approximately 4-5" deep. We also advise that you have 12" of stone around the perimeter of the outbuilding to control weeds and keep moisture away from the building. Before installing the stone, you can either dig out 4" of soil and simply make the stone ground level, or you can make a frame with 4"x4"s or landscape timbers and then fill flush to the top with stone.
Concrete Pad - Another option would be to have a concrete pad installed. If you are going to have a concrete pad installed, remember to keep your pad as close to ground level as possible. We recommend that you make the pad 12’’ wider on each side of the building.
Using crushed stone or a concrete pad will increase the longevity of your building/ playhouse. Having the proper site allows needed air flow, which will keep your building/playhouse looking great for years to come!
Permits: If it is necessary to obtain a building permit or cross a neighboring property, it is the buyer’s responsibility to obtain a neighbor’s permission of the necessary permit prior to delivery.
Customer is responsible for all site prep and permits.